Roof 2
We were called upon to replace the existing roof. We removed the existing shingles and replaced a couple pieces of the roof decking. We installed a new 30 year Tamko dimensional shingles in Aged Wood. We installed custom aluminum drip edge and replaced the plumbing pipes and air vents. To finish up we installed ice and water shield and step flashing. Once completed the Owner had us back out to do some brick work. They were very happy with the finished product!