W.E Bilbrey General Contractor Logo
(937) 461-0435

Bathroom 22

This hall bathroom required an update. We incorporated the area formerly used for a closet as an addition into an existing bathroom layout. The owner opted to have the tub removed and a shower installed with custom cultured marble and MOEN shower head and grab bars. A new vanity, cultured marble countertop, and sink faucet were selected and installed. We painted; added a new custom mirror and light fixture. To complete the look, we installed a new vinyl floor. Upon completion the owner was thrilled with the finished project.

AFTER
AFTER
AFTER
AFTER
AFTER
BEFORE
BEFORE
BEFORE
×