W.E Bilbrey General Contractor Logo
(937) 461-0435

Bathroom 25

We were called upon to update the master bathroom. The homeowner wanted to expand the shower and vanity areas. We removed an existing closet to make room for a larger shower and reduced the size of the toilet area to allow for a larger vanity area. The customer opted for new marble tile throughout and a new bidet toilet. We were also able to add a new linen cabinet to the toilet area for some additional storage. The homeowner was thrilled with the complete bathroom.

AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
×