Basement Remodel 7
We were called upon to finish this basement. All the plaster on the walls was torn out, replaced with drywall and then painted. A new drop ceiling was installed. The stairs were redone with a stained and painted wood. New vinyl plank flooring was installed. A full bath was added as well. It has tile flooring and marble walls in the shower area. A new vanity was installed as well as a toilet. New lighting was put in and an exhaust fan. In the end the homeowner is very happy with how their new basement.