Bathroom 10

This was a complete bathroom renovation. The client wish list included updating the bathroom and adding a double sink with some additional storage. We achieved this by removing the existing vanity, built-in utility cabinet and the wall between them. We installed a new vanity layout which included two sinks and a utility cabinet at either end. We installed a new tub, tiled the tub walls, vanity area and the floor. We installed two nitches in the tub area and a can light for additional lighting. We painted; added trim moldings and a new mirror and light fixture completed the transformation.