Bathroom Remodel

Bathroom 26

We were called to fully remodel this master bathroom. This bathroom was fully demoed. A new tub and shower base were installed. We installed new tile floors, a tiled shower base, and tiled up the walls the shower as well as around the tub. We refurbished the existing pre-existing vanity and a new mirror was installed. We installed new lighting over the vanity, a light in the shower and a chandler over the tub. We painted the bathroom and installed new trim throughout. In the end the homeowner was happy with the finished result.