Bathroom 6
We were called upon to remodel this outdated bathroom. The customer wanted to keep a tub, so we removed the old and installed a new steel tub. We tiled the tub walls and installed a new handheld shower faucet. The old flooring was removed and we installed a subway tile floor. A new vanity, countertop/sink and sink faucet were added. We put fresh paint on the walls and installed a new mirror and light fixture over the vanity. A tile backsplash was added. We installed a new can light over the tub area and the electric was updated. Once the project was complete the owner was thrilled with the results.