W.E Bilbrey General Contractor Logo
(937) 461-0435

Bathroom 6

We were called upon to remodel this outdated bathroom. The customer wanted to keep a tub, so we removed the old and installed a new steel tub. We tiled the tub walls and installed a new handheld shower faucet. The old flooring was removed and we installed a subway tile floor. A new vanity, countertop/sink and sink faucet were added. We put fresh paint on the walls and installed a new mirror and light fixture over the vanity. A tile backsplash was added. We installed a new can light over the tub area and the electric was updated. Once the project was complete the owner was thrilled with the results.

AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
BEFORE
BEFORE
BEFORE
BEFORE
BEFORE
BEFORE
BEFORE
×