Bathroom 8

We were called upon to completely renovate the existing bathroom. We demoed this bathroom down to the wall studs and main subfloor. We installed new green board, plumbing and electric lines. The Owner wanted a shower instead of a tub and we installed a fiberglass unit. A new vanity, wall boutique cabinet and utility cabinet were installed. A countertop, sink and faucet were installed. A new medicine cabinet and light fixtures were installed, as well as a new exhaust fan. To complete the look, we installed a new vinyl floor, chair rail and painted the walls in a two tone. The ceiling was painted and new trim moldings were installed. Once completed the Owner was extremely happy with the results!