W.E Bilbrey General Contractor Logo
(937) 461-0435

Bathroom Remodel 23

We were called to update this homeowner’s hall bath. We fully demoed this bath. We replaced the tub and laid tile on the three shower walls. A tile floor was laid as well. A new vanity was installed with a countertop and new sink. A new mirror and light fixture were hung. A towel rack was hung above the new toilet. All of the plaster walls were removed and replaced with drywall. Grab bars were put in place in the shower. In the end the homeowner was thrilled with the finished result.

AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
×