W.E Bilbrey General Contractor Logo
(937) 461-0435

Whole House Remodel 4

We were called to update the entire first floor of this home. New flooring was put throughout the whole first level. In the kitchen new cabinets were put in place as well as an island topped with a gorgeous countertop and a tile backsplash to bring it together. A hood vent was installed over the stove and a new sink and faucet were installed as well. Moving into the living room and dining area new baseboards and casing was installed around windows and doors. Crown moldering was put in at the ceilings to give the room a pop and everything was painted. Once in the bathroom your eye will first be drawn to the beautiful tiled shower that has ascent tile which matches the tile in the kitchen. A tile backsplash in that same tile can be seen over the new vanity we installed. A new sink faucet, sink and shower faucet system were installed as well. Needless to say, the customer was elated with the finished product.

AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
AFTER
×