
Whole House Remodel 7
We were called upon to remodel numerous rooms in this home as well as replace the siding on the house and garage. To start in the bedroom of this home; we repainted the walls and ceiling to refresh the room. We removed a sliding patio door and replaced it with windows. The wall that connects to the bathroom was moved to make the bathroom bigger. The ceiling fan was moved to be in the center of the room. Finally, within this room new carpet was installed. Moving down the hallway we laid a laminate floor. Leading us into the bathroom which has the same new flooring as the hallway. We installed a free-standing tub. Fully renovated the shower. A tiled shower pan was put in place. We fully tilled the shower walls as well as the walls around the standing tub. We installed a new vanity, lighting, trim and painted the room. Down the hall into the kitchen, we fully renovated this space. The same laminate flooring that’s in the bathroom and hallway has been placed in the kitchen as well. We installed new cabinets and countertop. A new tile backsplash was installed as well. In the dining area of this home, we have fully covered the walls and ceiling in shiplap. Installed new lights and baseboards.
























